dario No Comments

During 2015, we performed corrosion protection works on the new heat accumulator TE-TO Zagreb.

This task included raising and lowering of the 30-tons-heavy roof structure to the height of 50 meters with the help of 1,200-tons crane, and the delicate operation had to be carried out on a day without rain and wind.